By Colin Frampton
•
January 13, 2026
The team at Frampton Roofing recently completed a large-scale industrial roofing project at the Flambeau warehouse and manufacturing facility in Ramsgate . This enormous roof had seen years of wear and was in urgent need of attention to prevent further deterioration. From moss-choked valleys to cracked sheeting and overgrown drainage systems, this was a serious clean-up and repair mission—executed while keeping the busy site operational throughout. The Challenge Flambeau’s factory spans a huge footprint, with long, pitched valley roofs running the length of the site. Over time, the central valleys had become overrun with: 🟢 Thick moss and vegetation growth 💧 Standing water due to blocked or sagging drainage ⚠️ Cracked and damaged sheeting along the valley lines 🌧️ Increased risk of leaks and pooling during heavy rain The goal was to restore effective drainage, clear debris, and repair visible damage—ensuring the roof would perform safely over the winter months and beyond.