PROJECT
Roof Repair at Dame Janet School, Ramsgate, After Lead Theft
How we put Dame Janet School's roof back together after lead thieves stripped the chimney flashings — and made sure it couldn't happen again.
At-a-glance
Location: Ramsgate, Kent
Property Type: Primary school
Service: Leadwork and fibreglass repair
Year: 2025
Duration:
Materials: Code 4 lead flashings, site-laminated fibreglass chimney back tray
The brief
Lead theft is a miserable, entirely avoidable problem, and schools get hit more than most. At Dame Janet Primary School in Ramsgate, the lead cover flashings had been taken from the chimney back tray — the drainage detail that catches water running down the roof above a stack and carries it away to either side.
Strip that out and you've removed the one thing standing between rainwater and the inside of the building. It doesn't take long for that to become a problem, and in a school it isn't just a maintenance issue. It's classrooms, ceilings and equipment.
What was needed was a repair that made the roof watertight again — and, sensibly, one that wouldn't simply be stolen a second time.




